Steel and TMT orders are placed in pieces or bundles but billed by weight in kilograms or tonnes, at a rate that can change every day. In TallyPrime, keep weight as the billing unit with pieces as an alternate unit, record the agreed rate on the sales order, and update the price list with a new Applicable From date whenever the base rate moves.

What is special about steel orders

A builder orders “12 mm TMT 5 ton, 8 mm 2 ton, 16 mm 40 pcs”. Some lines are in tonnes, some in pieces. Actual weight per piece varies within tolerances, so the final bill is by weighed or theoretical weight, not by the piece count alone.

Rates move with the market, and an order booked today at today’s rate may be lifted over several days. Disputes start when the rate on the bill does not match what was agreed on the phone, or when theoretical and actual weight differ.

TallyPrime setup for steel

Make the unit and the rate explicit.

  1. Use Kg or MT as the main unit for TMT bars and structural steel, with Pcs or Bundle as an alternate unit (for example 1 Pcs of 12 mm, 12 m ≈ 10.66 kg theoretical; use your mill’s figure).
  2. Create stock items per size and grade: “TMT Fe 550D 12 mm (brand E)”.
  3. Keep one price list per stock group and update it with Alt+R (Revise Price) and a new Applicable From date when the rate changes.
  4. Enter the agreed rate on the sales order itself, so later deliveries against that order carry the booked rate.
  5. Mention in the narration whether billing is on actual or theoretical weight.

Checks before you confirm

Most steel disputes are about weight and rate.

  • Unit: tonnes versus pieces on each line.
  • Rate validity: how many days the booked rate holds.
  • Grade and brand: Fe 500D and Fe 550D are different items.
  • Transport: e-way bill when the consignment value crosses ₹50,000, which almost every steel load does.
Example: builder order converted to billing weight (invented weights and rates)
Builder wroteStock itemOrderedBilling quantityBooked rate
12 mm TMT 5 tonTMT Fe 550D 12 mm5 MT5,000 kg (approx. 469 pcs)₹58.40 per kg
8 mm 2 tonTMT Fe 550D 8 mm2 MT2,000 kg₹59.10 per kg
16 mm 40 pcsTMT Fe 550D 16 mm40 Pcs≈ 758 kg theoretical₹58.20 per kg
binding wire 50 kgBinding wire 20 g50 Kg50 kg₹74.00 per kg

Where OrderDak fits

OrderDak reads orders that arrive as forwarded email, pasted WhatsApp chats (English and Hinglish), PDF purchase orders, Excel or CSV sheets and photos of printed orders. It matches each line to your Tally stock items, learns each customer’s own names for your items, and checks rate tolerance, pack sizes, stock, credit limit and duplicate PO numbers before anything is approved. OrderDak compares each order’s rate with your price list or the party’s own rate, within a tolerance you set. Approved orders become TallyPrime (3.0+) Sales Orders through an import file or the OrderDak bridge on the Tally PC (beta). It is free for 14 days, then a Free plan of 50 orders a month or Pro at ₹1,199 a month + GST.

Try OrderDak free for 14 days

Questions

Should steel be billed in pieces or kilograms?

Most traders bill by weight. Keep kilograms or tonnes as the main unit and pieces as an alternate unit so the order can be taken either way.

How do I lock a booked rate?

Enter the agreed rate on the sales order line. Deliveries against that order pick up its rate even if the price list changes later.

Do steel deliveries need an e-way bill?

When the consignment value is more than ₹50,000, an e-way bill is required for the movement; most steel loads cross that.

Sources

General information, not tax advice. Menu names can differ slightly between TallyPrime releases; GST rates and rules change, so confirm with your CA.

Related: When does a distributor’s delivery need an e-way bill? · How to sell in boxes and pieces in TallyPrime: compound and alternate units · Order-taking for cement distributors on Tally · GST on order calculator · All Tally guides