Cement orders are placed in bags or truck loads, often delivered straight to a construction site, with a rate that includes or excludes freight and changes often. In TallyPrime, sell in bags with tonnes as an alternate unit, enter the agreed delivered or ex-godown rate on the sales order, link deliveries with delivery notes, and generate an e-way bill for each load over ₹50,000.

How cement orders work

A builder calls: “OPC 53 grade 400 bags to the Whitefield site, PPC 200 bags next week”. That is 20 tonnes and 10 tonnes. The order may be delivered in several truck loads, some directly from the plant or rake point, some from your godown. Rates are quoted per bag, delivered or ex-godown, and move with the market.

Unloading charges, freight and site access are frequent sources of dispute. Cement is heavy and the consignment value of a truck is high, so every load needs proper transport papers.

TallyPrime setup for cement

Make the load and the freight visible.

  1. Create stock items by brand and grade (OPC 53, PPC) with Bag as the unit and MT as an alternate unit (20 bags of 50 kg = 1 MT).
  2. Create godowns for your warehouse and treat direct plant deliveries as their own location if you need to see them separately.
  3. Enter the agreed rate on the sales order and say in the narration whether it is delivered or ex-godown; add freight as a separate ledger line where you charge it.
  4. Enable tracking numbers for delivery notes so each truck is a delivery note linked to the order, and invoice against them.
  5. Pre-close any balance the builder no longer needs.

Load-level checks

Each truck is a small transaction of its own.

  • E-way bill for each load over ₹50,000.
  • Vehicle number and site address on the delivery note.
  • Bags delivered versus bags ordered; short deliveries are common.
  • GST on cement and on freight follows their own rules; check current rates on CBIC and ask your CA about freight.
Example: a site order delivered in two truck loads (invented rates)
LineStock itemOrderedTruck 1Truck 2
OPC 53 400 bagsCement OPC 53 grade (brand L), 50 kg400 Bag (20 MT)200 Bag200 Bag
PPC 200 bagsCement PPC (brand L), 50 kg200 Bag (10 MT)–Due next week
RateDelivered to site₹385 per bag₹77,000 value₹77,000 value
E-way billValue over ₹50,000–RequiredRequired

Where OrderDak fits

OrderDak reads orders that arrive as forwarded email, pasted WhatsApp chats (English and Hinglish), PDF purchase orders, Excel or CSV sheets and photos of printed orders. It matches each line to your Tally stock items, learns each customer’s own names for your items, and checks rate tolerance, pack sizes, stock, credit limit and duplicate PO numbers before anything is approved. OrderDak compares the order’s rate with your list or the party’s own rate within the tolerance you set. Approved orders become TallyPrime (3.0+) Sales Orders through an import file or the OrderDak bridge on the Tally PC (beta). It is free for 14 days, then a Free plan of 50 orders a month or Pro at ₹1,199 a month + GST.

Try OrderDak free for 14 days

Questions

Should cement stock be in bags or tonnes?

Bags are what you count and sell; keep tonnes as an alternate unit for reporting and transport papers.

How do I record each truck against one order?

Make a delivery note per truck against the sales order, with tracking numbers on, and invoice against the delivery notes.

Does every cement truck need an e-way bill?

When the consignment value is over ₹50,000 an e-way bill is required for the movement; a full truck of cement almost always crosses it.